Fabrication Facility & Association Buildings

Design Registration Website: https://apps.exyte.net/vendorproductsubmission/​

Design Vendors – Manufacturers – Distributors desiring to provide product information to the Design Firm for Foxconn's Fabrication Facility and associated support facilities in Area 1 of the Wisconn Valley Science & Technology Park. 

Products might include paint materials, plumbing, wiring,​ and associated clean room materials. Once product information is submitted, the material will be routed to the appropriate design discipline lead.


Gilbane|Exyte Construction Registration Website: 

https://Foxconn-construction.gilbaneco.com

Subcontractors – Vendors – Suppliers – Professional Services Firms MUST register their entities to receive information for procurement (bidding) notification(s).​ Interested parties only need to register with Gilbane|Exyte once. It is not necessary to register for individual projects. ​

These links are being provided for informational purposes only; they do not constitute an endorsement or an approval by the State of Wisconsin or Wisconsin Economic Development Corporation of any of the products, services or expressed opinions. The State of Wisconsin and Wisconsin Economic Development Corporation bear no responsibility for the accuracy, legality or content of the external site. Contact the external site with questions regarding its content.​


​​ ​​ ​

​​​Bid Opportunities

#5d - Fabrication Facility MEP Work for Assembly and Office Areas – Invitation to Bid

Bid Release 5D - Fabrication Facility MEP Work for Assembly and Office Areas - Invitiation to Bid

​Bid Package #​
​Description
21A
Fire Protection Systems
23B
Mechanical and Plumbing Work for Office and Assembly
26F​
​Electrical, Lighting and Low Voltage for Office and Assembly
28B​
Life Safety Systems and Security for Office and Assembly

The Invitation to Bid for Bid Release 5d for Foxconn's Industrial Construction Work Phase 1, Area 1 of Wisconn Valley Science and Technology Park is now available. This bid release includes mechanical, plumbing, fire protection, electrical, security and low voltage work required in the office and assembly areas of the fabrication facility.

The Gilbane | Exyte non-disclosure agreement (NDA) must be signed and returned to Gilbane | Exyte to participate in this bid release. If your firm is interested in any of the packages listed herein, please return the intent to bid form and NDA per directions included in the invitation. The full instructions, along with the non-disclosure agreement are included in the Invitation to Bid.

Download – Invitation to Bid - Bid Release 5d – Fabrication Facility MEP Work for Assembly and Office Areas




#5e - Turnkey Systems – Invitation to Bid​​

Bid Release 5e - Turnkey Systems – Invitation to Bid

​Bid Package #​
​Description
​13A
Waste Water Treatment Systems Work
13B
Ultra Pure Water Systems Work
13C​
​Process Chemical Systems Work
13D
​Specialty Gas Systems Work
13G
Bulk Gas Yard and Nitrogen Plant Work

The Invitation to Bid for Bid Release 5e for Foxconn's Industrial Construction Work Phase 1, Area 1 of Wisconn Valley Science and Technology Park is now available. This bid release includes the turn-key design-build packages for specialty systems that support the fabrication building operations. Updated to note date, time and location for Pre-Bid Conference and Matchmaking Session.
 
The Gilbane | Exyte non-disclosure agreement (NDA) must be signed and returned to Gilbane | Exyte to participate in this bid release. If your firm is interested in any of the packages listed herein, please return the intent to bid form and NDA per directions included in the invitation. The full instructions, along with the non-disclosure agreement are included in the Invitation to Bid.​

#6a - Fabrication Facility Interiors Work for Assembly and ​Office A​reas​ – Invitation to Bid​​​

Bid Release 6a - Fabrication Facility Interiors Work for Assembly and Office Areas​ – Invitation to Bid

​Bid Package #​
​Description
​06B
Carpentry (Interiors)
​08B
Doors, Frames, Hardware (Interiors)
​09A
Structural Studs, Interior Framing, Drywall​
​09C
Resinous Flooring and Coatings​
​09D
Soft Flooring Systems
​09E
Hard Flooring Systems​
​09F
Acoustical Systems​
​09G
Painting and Wall Coverings​
​10A
Exterior Building Signs (FAB Only)​
​10C
Specialties​
​10D
Operable Partitions​
​10E
Code Signage
​11B
Food Services​
​13H
​FMCS Systems Integrator and Control Systems Phase 0
​​​13J

Clean Room- Envelope​

The Invitation to Bid for Bid Release 6a – Fabrication Facility Interiors Work for Assembly and Office Areas for Foxconn's Industrial Construction Work Phase 1, Area 1 of Wisconn Valley Science and Technology Park is now available. This bid release includes interior finishes, doors, frames, hardware, specialties and the clean room envelope work required in the office and assembly areas of the fabrication facility; and has been updated to include FMCS Systems Integrator and Control Systems Phase 0. 

The Gilbane | Exyte non-disclosure agreement (NDA) must be signed and returned to Gilbane|Exyte to participate in this bid release. If your firm is interested in any of the packages listed herein, please return the intent to bid form and NDA per directions included in the invitation. The full instructions, along with the non-disclosure agreement are included in the Invitation to Bid.

Download – Invitation to Bid – Bid Release 6a Updated – Fabrication Facility Interiors Work for Assembly and Office Areas

​​

​​Awarded Bids

#4a- Foundations & Related Work​

Company

Scope of Work

Location

PSI Intertek
Materials Testing for Foundations and Related Construction
Waukesha, WI
CD Smith Construction
Excavation and Concrete Foundation Work
Fond du Lac, WI
Otis Elevator Company
Elevator Work
Milwaukee, WI